HomeNewsPhotos

Photos

307 CES gives wing headquarters sign a facelift
Airmen assigned to the 307th Civil Engineer Squadron ready concrete mix that will be used to fill holes in the 307th Bomb Wing headquarters sign on April 11, 2018, Barksdale AFB, La. The sign is getting a complete makeover and will match the entrance gate signs on Barksdale. (U.S. Air Force photo by Greg Steele/Released)

Download Image: Full Size (1.37 MB)
Tags:
Photo by: Master Sgt. Greg Steele |  VIRIN: 180411-F-PF761-003.JPG